Structured Cabling Recent Projects
Citation Oil & Gas
Completed the installation of a structured cabling system for Citation Oil and Gas’ new 82,000 sq. ft. corporate headquarters located in NW Houston. A new construction project, which included the installation of a Category 6 end to end solution, build out of 6 IDF’s, Data Center, horizontal cabling and copper / fiber backbone. A Commscope/Systimax certified solution was installed.
Baylor College of Medicine
Ongoing cabling maintenance contract for Baylor College of Medicine’S 17 facilities. All moves, adds and changes are completed by DataVox’s in house certified technicians. DataVox’s unique online tools are utilized for order processing, work order history, and invoicing. DataVox has ongoing projects with Baylor College of Medicine.
Katy ISD
Completed the installation of a Category 5e structured cabling system for Katy ISD. Project included the installation of approximately 1000 cable segments; copper and fiber backbone and build out of new IDF and MDF closets. A Panduit solution was installed.
Lamar Consolidated ISD
Completed the installation of a structured cabling system for LCISD’s two new elementary schools. Project consisted of installing a Category 6 end to end solution, copper / fiber backbone, build out of multiple IDF’s and projector requirements. A Panduit Category 6 certified solution was installed.
City of West University Place
Completed multiple projects for City of West University Place: City of West University Place Recreation Center, Colonial Park and City Hall. Installed an end to end Category 6 structured cabling system to meet the needs of the City: TC build out, horizontal and backbone cabling, and installation of cabling for other systems such as CATV/Surveillance. A Panduit Category 6 solution was installed.
Pasadena Independent School District
Completed a campus wide project for PISD; installed a Category 6 solution for all wireless access points in the District. Approximately 1400 cable segments were installed for the new Wireless access points. A Commscope Uniprise solution was installed.
American Bureau of Shipping
Completed the installation of a High Density fiber solution for the American Bureau of Shipping’s existing Data Center. Solution included Systimax’s 360 Ultra High Density Solution. Also, a new fiber backbone was installed utilizing pre-terminated trunk cables. The newly-installed solution met ABS’ needs: a high density fiber solution within a small footprint and future scalability within their existing cabinets. A Systimax solution was installed.
Aker Solution Group
Completed the installation of a Category 6 structured cabling system for Aker Solution Groups. A multi-floor build out that included the installation of approximately 1500 cable segments, fiber and copper backbone, 5 IDF and 1 MDF closets. A Commscope Uniprise Solution was installed.
NATCO
Completed the installation of a structured cabling system for NATCO’s new corporate offices. New construction project that included installation of approximately 1500 Category 6 cable segments, multiple IDF’s, Data Center and copper and fiber riser backbone. In addition, a complete overhead paging system and wireless system were installed. A Panduit end to end solution was installed.
Scotia Bank
Completed the installation of a structured cabling system for Scotia Bank’s new offices located at 711 Louisiana. Project is a 2-floor build out that includes the
installation of approximately 900 voice and data cables; copper and riser backbone. A Panduit Category 6 solution was installed.
Tenaris
Completed the installation of the Tenaris Corporations Data Center. Project included the installation of 16 cabinets that included (1100) 10 GIG connections and (204) fiber connections. Systimax 10 GIG solution was installed.
Gulf South
Completed the installation of a structured cabling system for Gulf South Pipeline new offices at 9 Greenway. Project was a 3-floor build out that included the installation of approximately 800 voice and data cable; riser and copper backbone were installed. A Panduit Category 6 solution was also installed.
NewPark Resources
Completed the installation of a structured cabling system for NewPark Resources new offices in the Woodlands, TX. Project was a full floor, new construction project that included the installation of approximately 500 voice and data cables. A Panduit
Category 6 solution was also installed.
NEXEN
Completed the installation of a structured cabling system for Nexen Energy’s new offices at One Briar Lake Plaza. Project was a full floor, build out that included the installation of approximately 475 voice and data cables. A Commscope Category 6 solution was also installed.
LINN Energy
Completed the installation of a structured cabling system for Linn Energy’s new offices at Chase Tower. Project is a 2-full floor build out that included the installation of approximately 670 voice and data cables; fiber and copper backbone. A Panduit Category 6 solution was installed.
Repsol
Completed the installation of a structured cabling system for Repsol’s new offices located in the Woodlands, TX. Project is a 3-floor build out that includes the installation of approximately 1200 voice and data cables; copper and riser backbone; 6 IDF closets and a Data Center. A Leviton Category 6 solution was installed.
Pride International
Completed the installation of structured cabling system for Pride International. Project consisted of an eight floor restack and Data Center. Installation included approximately 2000 voice and data cable segments, copper and fiber riser backbone. Also included the build-out of a new Data Center that was comprised of 15 cabinets. A Panduit/ Commscope solution was installed.
Oceaneering
Completed the installation of a structured cabling system for Oceaneering’s new HPC manufacturing facility. A new construction project, which included the installation of a Category 6 end to end solution; horizontal cabling, fiber backbone and wireless antennas were installed. A Panduit certified installation.